Go Back   2018 2019 EduVark > Education Discussion > General Discussion



  #1  
Old December 13th, 2017, 04:46 PM
Unregistered
Guest User
 
Posts: n/a
Default AICTE MODROBS Utilization Certificate

Hi I would like to have the information about Modernization and Removal of Obsolescence (MODROBS) as well as the details of the different aspects of MODROBS?
Reply With Quote Quick reply to this message
Similar Threads
Thread Thread Starter Forum Replies Last Post
All India Council for Technical Education + MODROBS Unregistered General Discussion 2 March 8th, 2018 09:20 AM
aicte approved mba colleges in durgapur Discuss about aicte approved mba colleges in durgapur here. Welcome to Eduvark.com and this page is for aicte Rohit Barla General Discussion 0 April 6th, 2017 06:18 PM
agricultural utilization research institute auri Harsh Pandit General Discussion 0 April 3rd, 2017 11:44 AM
cps school utilization Harsh Pandit General Discussion 0 March 31st, 2017 05:21 PM
AICTE Modrobs Proposal Sample Unregistered General Discussion 1 March 29th, 2017 12:12 PM
aicte aicte approved colleges Rohit Barla General Discussion 0 March 23rd, 2017 04:27 PM
agricultural utilization research institute Rohit Barla General Discussion 0 March 22nd, 2017 11:52 AM
nda e-admission certificate Discuss about nda e-admission certificate here. Welcome to Eduvark.com and this page is for nda e-admission certificate Rohit Barla General Discussion 0 March 10th, 2017 04:06 PM
AICTE Modrobs Utilization Certificate Format Unregistered General Discussion 1 February 2nd, 2017 04:30 PM
DRDO Utilization Certificate Unregistered General Discussion 1 August 1st, 2016 01:28 PM
KSOU AICTE Approval Certificate Unregistered General Discussion 1 June 25th, 2016 06:27 PM
Power Grid Utilization Unregistered General Discussion 0 August 13th, 2015 02:16 PM
Is there any alternative for the provisional certificate as the company officials asking for Provisional Certificate Unregistered General Discussion 1 July 3rd, 2014 12:53 PM
PTU B. Tech EE-6th Semester Electric Drives and Utilization Exam paper Unregistered General Discussion 1 June 25th, 2014 05:35 PM
Tips to check whether my certificate is AICTE or UGC approved? Unregistered General Discussion 1 June 23rd, 2014 02:04 PM

  #2  
Old December 14th, 2017, 09:03 AM
Super Moderator
 
Join Date: Mar 2012
Posts: 33,070
Default Re: AICTE MODROBS Utilization Certificate

The MODROBS scheme expects to modernize and evacuate out of date quality in the Laboratories/Workshops/Computing offices (Libraries are barred), in order to improve the useful productivity of Technical Institutions for Teaching, Training and testing purposes.

It likewise bolsters new advancements in Class Room and Laboratory/Teaching Technology, improvement of Lab Instructional Material and proper Technology to guarantee that the commonsense work and venture work to be done by understudies is contemporary and suited to the necessities of the Industry.

The gear financed under the plan up to a furthest reaches of Rs 20 lakhs/ - could be in a perfect world utilized for up degree of hardware in existing research centers, improvement of execution parameter particular of existing hardware, fuse of most recent advancement in the field and substitution of old devalued gear by present day gear.

Notwithstanding above significant destinations, the gear introduced through MODROBS can be utilized for aberrant advantage to Faculty/Students through Continuing Education programs, Training programs for nearby industry and consultancy work.

Qualification

(a), (b) and (c) can be included from activity for Academic Networks

(a) AICTE endorsed Technical Institutions/University Departments with no less than 10 years of presence. (b) For self financing/Institutes:

Greatest 3 recommendations for every foundation every year including endorsed before yet not finished would be considered.

(c) For Govt. /Govt. supported Institutes:
Most extreme 10 proposition for each establishment every year including endorsed before yet not finished would be considered.

Term of the Project

(a) Duration of venture will be two years from the date of receipt of assets in the foundation's account.

Limit of Funding

(a) Total financing of Rs.20 Lakh. 8.1.5 Disbursement of the Funds

(a) 100% concede of authorized sum will be discharged to Govt. /Govt. helped Institutes.

(b) To private establishments, gifts will be authorized as 80% of the endorsed sum as progress took after by 20% as repayment on accommodation of the Utilization authentication and other supporting records as determined in wording and states of MODROB.

Processing Methodology:

(a) The proposition should be surveyed by a specialist board constituted as takes after:

(b) Three part master board of trustees not underneath the rank of Associate Professor.

No less than two individuals among the specialists should be from the concerned stream

Modernisation & Removal of Obsolescence Proforma Cum Evaluation Sheet

Reply With Quote Quick reply to this message
Reply


Quick Reply
Your Username: Click here to log in

Message:
Options

Forum Jump


All times are GMT +5.5. The time now is 05:23 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2018, vBulletin Solutions, Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3