NBPDCL is an organization enrolled under the arrangements of Companies Act 1956 and isa completely claimed backup Company of BSPHCL.

The Company is locked in principally in the matter of dissemination of Electricity. It has been vested with the conveyance resources, enthusiasm for property, rights and liabilities of the recent BSEB essential for the matter of dispersion in its region of circulation including each of the 21 locale of North Bihar in particular

1. West Champaran, 2. East Champaran, 3. Sitamadhi, 4. Sheohar, 5. Muzaffarpur, 6.Vaishali, 7. Saran, 8. Siwan, 9. Gopalgunj, 10. Mahubani, 11. Darbhanaga, 12. Samastipur, 13. Begusarai, 14. Khagaria, 15. Saharsa, 16. Supaul, 17. Medhepura, 18. Araria, 19. Katihar, 20. Purnea and 21. Kishangunj

Distribution Projects

Fortifying of Power dissemination framework and evacuation of dispersion constraintsunder BRGF conspire

The Power area in Bihar is at present experiencing ocean change. The Power area inBihar is developing at a quicker rate to accomplish national level of per capita consumption.The pace of monetary advancement alongside expanding power request would requireadditional producing limit and also satisfactory conveyance arrange infrastructure to cook the present request and future load development.

The major action plans for strengthening of Power Distribution system as well as removal of distribution constraints distribution system under BRGF Phase-I are as follows:

• New 33 kV lines and strengthening of existing 33 kV feeders;
• Additional PSS/Augmentation of existing Power Sub Stations capacities;
• Strengthening of protective systems in Power sub- stations;
• Provision of capacitor Banks in selected Power Sub stations;
• New 11 kV lines & strengthening of existing 11 kV feeders;
• Sectionalisation of 33 kV & 11 kV lines and provision of fault passage indicators(F.P.I.);
• Additional D.T./ Augmentation of existing Distribution Transformer capacities;
• Protection of Distribution Transformers and provision of individual isolators (A.B.switch) on existing DTs;
• Strengthening of L.T. lines (removal of Bans- Balla);
• Use of phase separators in L.T. Lines & Guard wires in H.T. lines;

In the second phase of BRGF scheme, the outlook of the Distribution Companies is to get rid of distribution constraints arising on account of the followings:

• Peak demand of 5620 MW (2016-17) as projected by CEA;
• Upcoming agriculture load as envisaged under “Krishi Road Map”
• Sub-transmission network requirement for renewable energy sources such as SolarEnergy etc.

North Bihar Power Distribution Company at a Glance

Number of Districts
21

Number of Circles
7

Number of Divisions
28

Number of Sub Divisions
87

Number of Sections
334

Number of consumers
LT
2376746

HT
418

Number of 33 KV Feeders
139

Number of PSS
246

Number of 11KV feeders
825

Number of Power Transformers
506

Number of Distribution Transformers
20900

Admin Setup



Contact

North Bihar Power Distribution Company Ltd.
Second Floor, Vidyut Bhawan
Bailey Road, Patna 800 001


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 02:33 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8