What was the phase in which there was the highest absolute increase between the estimated and actual cost?
(1) Foundation
(2) Design
(3) Construction
(4) Cannot be determined

For which phase of the project was there the highest percentage increase in cost (as compared to the estimated cost).
(1) Foundation
(2) Design
(3) Construction
(4) Cannot be determined

What is the value of the percentage overflow in costs during construction? (approximately)
(1) 50%
(2) 33-33%
(3) 66-66%
(4) None of these

If internal finishing and painting can be started simultaneously at the end of construction, then what is the overflow of the project as a percentage of the estimated total time of completion of the project?
(1) 27-27%
(2) 33-33%
(3) 42-85%
(4) Cannot be determined

IGNOU OPENMAT exam paper 2




  #3  
November 25th, 2019, 08:35 AM
Super Moderator
 
Join Date: Mar 2012
Re: Download OPENMAT Solved Papers

In the given attachment we have given the details about OPENMAT Solved Papers.
Feel free to ask more by writing in reply box.
Attached Files
File Type: doc Download OPENMAT Solved Papers.doc (361.0 KB, 66 views)


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 08:45 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8