2023 2024 EduVark > Education Discussion > General Discussion


  #1  
July 2nd, 2016, 04:58 PM
Unregistered
Guest User
 
HPCL Solar Tender

Hi I am interested in having the details of the tender published by HPCL for the procurement of Solar PV System and Solar Water Heater?
Similar Threads
Thread
IIT Bombay Solar PV
DCE Solar
IIT Roorkee Solar
GAIL Solar Tender
IIT Bombay Solar
Tender of HPCL
IIT Bombay Solar Energy
HPCL E Tender Site
BPCL Solar Tender
IIT Bombay Solar Pv
SSNNL solar
LPU Solar Car
NTPC solar tender
IREDA Solar Loan
Solar PDPU

  #2  
July 2nd, 2016, 05:34 PM
Super Moderator
 
Join Date: Mar 2013
Re: HPCL Solar Tender

The tender is for Design, Supply , establishment and dispatching of 2.5 KW limit Solar PV System (Solar force plant) for lighting and 1500 liter every day limit sun powered water warming framework at HINDUSTAN PETROLEUM CORPORATION LIMITED (HPCL) East Zone Office Building at 771, Anandapur, Kolkata 700107. M/s Gherzi Eastern restricted (GEL) is designated Architect/PMC for the undertaking.

Work Schedule for Solar PV System and Solar Water Heater

SL. NO. Portrayal QTY UNIT

1 Design, make, Supply, Installation, dispatching of 2.5 KWp sunlight based PV half and half framework (sun oriented force plant) for lighting according to specialized determination .

1 LS
NOTE Rate might incorporate giving common work and Module mounting structure (MS point support). 2 Design, produce, Supply, Installation, authorizing of 1500 liter for each day limit sun based water radiator framework according to specialized detail .

1 LS NOTE Rate might incorporate giving 25mm dia Mid-range quality GI funnel from Cold water tank to Solar Collector and Solar authority to Hot water tank and boiling point water tank to Kitchen in 6th floor with protection (Appx. Qty 40m). Icy water tank is not in extent of merchant. 3 Post guarantee Comprehensive AMC for sunlight based PV framework (sun based force plant) and sun powered water warmer framework including Preventive support ( month to month one visit to site) and separate support (as and when break down call is given). Saves might be in the extent of vendor.1st year

1 YEAR
4 Post guarantee Comprehensive AMC for 2nd year

1 YEAR
5 Post guarantee Comprehensive AMC for third year

1 YEAR

Specialized Specification for Solar PV System for Lighting

The Scope of Work might incorporate the accompanying,

a. Plan, produce, supply, establishment, dispatching of 2.5 KWp Sun based PV half and half framework (Solar Power Plant ) for lighting

b. Point by point arranging of smooth execution of the task

c. Execution testing of the complete framework and guarantee

d. After deals administration, specifically or through neighbourhood legally binding game plan

e. Hazard obligation of all work force connected with the usage acknowledgment of the task

f. Yearly support contract of the Power Plant for 3 Years after guarantee period. Light fittings to work with sun oriented force 18 Watt CFL x 35 nos. Open air Lights

5 Watt CFL x 20 nos. Garden Lights 36 Watt LED x 4 nos. Post Top Fitting (36Watt LED X 01)

Note: Supply of light fittings and supply of link from sun based force board to light fittings are not in the extent of merchant. Span of Operation ; 12 Hrs every day. Outline Basis

Sun based PV Power plants might be planned considering the accompanying:

1. Loads: Total load that might be supplied by 2.5 kWP Solar PV Power plant having 2.5 KVA 230V, 1-ph, 50Hz inverter 2 nos. The heap utilization showed above should be met by sunlight based force plant.

2. Crest Sun sparkle hours: 5 hours for every day

3. Battery bank might be intended for 2 days (1 + 1 ìNo Sun Dayî) of independence. See battery subtle elements underneath.

4. Framework voltage : 48V/96V dc (ostensible)

5.The effectiveness of the Power molding unit and battery to be considered as 90% and 85% individually. 6. Giving Hybrid Power Conditioning Unit (PCU) where battery can be charged through AC power Grid (EB supply) in crisis.

Please find the comprehensive details of the details of the job work which has been issued by the HPCL attached in the below file

Work Schedule for Solar PV System and Solar Water Heater


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 08:21 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8