#1
May 7th, 2016, 10:11 AM
| |||
| |||
KSEB Temporary Connection
Hi buddy my self Harish I have come to get KSEB Temporary Connection Application Form, so can you plz tell me from where I can get it ?? Kerala State Electricity Board Ltd (KSEB ) is a public sector agency under the Government of Kerala, India, As you are asking for KSEB Temporary Connection Application Form, so on your demand here I am providing same for you: KSEB Temporary Connection Application Form Power Generation Kerala State Electricity Board Ltd has 23 hydro-electric projects, two diesel power plants and one Wind Farm. The total installed capacity is 2229.6 MW. They are Hydro Electric Projects (1940.2 MW) Idukki (780.00 MW) Sabarigiri (335 MW) Idamalayar (75 MW) Sholayar (54 MW) Pallivasal (37.5 MW) Kuttiyadi (225 MW) Panniar (30 MW) Neriamangalam (77.65 MW) Lower Periyar (180 MW) Peringalkuthu & PLBE (43 MW) Sengulam (48 MW) Kakkad (50 MW) Small Hydro Electric Projects (52.85 MW) Kallada (15 MW) Peppara (3 MW) Malankara (10.5 MW) Madupatty (2 MW) Malampuzha (2.5 MW) Lower Meenmutty (3.5 MW) Chembukadavu - 1 (2.7 MW) Chembukadavu - 2 (3.7 MW) Urumi -1 (3.75 MW) Urumi -2 (2.4 MW) Kuttiyadi Tail Race (3.75 MW) Peechi (1.25 MW) Thermal Projects (234.6 MW) Brahmapuram Diesel Power Plant (106.6 MW) Kozhikode Diesel Power Plant (128 MW) Non-conventional energy (2 MW) Kanjikode Wind Farm (2 MW) Last edited by Neelurk; February 21st, 2020 at 08:40 AM. |