#1
July 14th, 2014, 01:32 PM
| |||
| |||
Mettur Thermal Power Plant
I want to visit the Mettur Thermal Power Plant and for that I want to get the details of Mettur Thermal Power Plant so can you please arrange it for me? As you want to get the details of Mettur Thermal Power Plant so here it is for you: Mettur Thermal Power Station was started back in the year of 1987 and it is a coal-fired electric power station located in Salem district of Tamil Nadu. It is operated by Tamil Nadu Generation and Distribution Corporation Limited. METTUR 1 x 600 MW -PROJECT MAJOR MILESTONES Milestones Scheduled date Actual / Anticipated date Boiler Erection commencement 27.07.09 29.09.09 Boiler Drum Lifting 11.2.10 25.02.10 Boiler Hydraulic test 28.09.10 18.03.11 Turbine Barring gear 30.03.11 20.01.12 Boiler light up 24.03.11 30.01.12 Synchronisation 13.06.11 04.05.12 Commissioning (Full load) 21.09.11 11.10.12(Touched Full load) Commercial Operation Declaration(Sustained Generation of 600 MW) 21.09.11 12.10.2013 Plants: Unit cost in Crores Rs Continuous running in days Capacity(M.W) Date of Commissioning I 384.3 227 days 210 07-Jan-87 II 384.3 205 days 210 12-Jan-87 III 351.76 272 days 210 22-Mar-89 IV 351.76 311 days 210 27-Mar-90 V 600 300 days 600 28 November 2012[3] Contact Details: Mettur Thermal Power Plant Thoppur - Mettur Dam - Bhavani - Erode Rd, Mettur, Tamil Nadu India Map Location: Image: Last edited by Neelurk; February 24th, 2020 at 01:19 PM. |
|