NPTI Simulator Training

I want to get the details of Simulator Training at National Power Training Institute (NPTI) so can you provide me?
Similar Threads
Thread
Npti mn
Npti tn
Training In NPTI
Npti ldc
NPTI Faridabad Training Calendar
NPTI SR For
Npti ghy
Npti Gis
Notification Of Npti
FMS Flight Management System Simulator
Aicte npti
NPTI MBA Cut Off
National Power Training Institute (NPTI)
Npti cet-16
Goat simulator review

  #2  
September 18th, 2017, 11:59 AM
Super Moderator
 
Join Date: Mar 2012
Re: NPTI Simulator Training

Simulator at National Power Training Institute NPTI provides a unique opportunity for its students to experience a full range of operation and stress situations in an integrated mode of Unit Operation.

Simulator Training

NPTI has equipped itself with a 500 MW & 430 MW CCGT Training Simulator at Corporate Office, Faridabad and high-quality, high-fidelity, real-time, full-scope & DDC/VPC/CRT-Keyboard based 210 MW Training Simulators (2 No.) at its Regional Institutes at New Delhi & Nagpur.

Self-driven multimedia Computer Based Training packages have been developed for extensive usage and training of personnel working in State Electricity Boards, Central Public Sector Undertakings and the Private Sector organizations etc.

Simulator Training Programs

1. 210 MW Fossil Fuel Power Plant Simulator Training
2. 500 MW Fossil Fuel Power Plant Simulator Training
3. Combined Cycle Gas Turbine Power Plant Simulator Training
4. 250 MW Hydro Simulator Training
5. Dispatcher Training Simulator
6. 800 MW Super Critical Thermal Power Plant Training Simulator

Actual plant operations that can be performed after simulator training:

Electrical charging of Boards and auxilaries with associated trippings.

General Service Water scheme with interlocks for bearing temparature

Coal Handling Plant operation with interlock logics

Furnace Safeguard and Supervisory system and Boiler interlocks

Cold Start

Hot Start

Three element control of Boiler Feed Water system with Scoop and DP control

Positive and Negative Differential Expansions of Turbine Rotor

Synchronisation when Synchroscope is at "ELEVEN O CLOCK" position

Leading or Lagging Power Factor on the CAPABILITY CURVE

For more details, go to the following link-

npti.in/pdf/Training%20Calendar%202017-18.pdf

Contact-

National Power Training Institute
BTPS Complex, Badarpur, Mathura Road, Badarpur Village, Badarpur, New Delhi, Delhi 110044


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 06:05 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8