I have knowledge about the National Thermal Power Corporation Limited Bengal (Farakka Super Thermal Power Station). So here I am telling you about it as you want.

Here I am telling you about it, as you want.

Country
India

Location
Nabarun, West Bengal



Farakka Super Thermal Power Station
Stage Unit Number Installed Capacity (MW) Date of Commissioning

First 1 200 January, 1986

First 2 200 December, 1986

First 3 200 August, 1987

Second 4 500 September, 1992

Second 5 500 February, 1994

Third 6 500 April, 2012

NTPC Power Stations
Thermal
Coal Based

Badarpur
Barh
Bongaigaon
Dadri
Darlipali
Farakka
Gadarwara
Kahalgaon
Khargone
Korba
Kudgi
Lara
Mauda
North Karanpura
Ramagundam
Rihand
Simhadri
Singrauli
Sipat
Solapur
Talcher
Talcher
Kaniha
Tanda
Unchahar
Vindhyachal

Coal Based
(Owned by JVs)
APCPL BRBCL Kanti Meja NPGC NSPCL NTECL

Gas Based
Anta
Auraiya
Dadri
Faridabad
Jhanor-Gandhar
Kawas
Kayamkulam

Gas Based
(Owned by JVs)
RGPPL


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 02:09 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8