2023 2024 EduVark > Education Discussion > General Discussion


  #1  
September 15th, 2016, 05:34 PM
Super Moderator
 
Join Date: Mar 2012
ONGC Hazira Gas Processing Plant

Hello sir, is there anmy one can provide me detail of savings and turbo expander of ONGC Hazira Gas Processing Plant?

The ONGC was set up the Hazira Plant, in 1985 & the largest sour gas-processing complex in the country.

This Hazira plant has presently been processing about 34-35 MMSCMD of Sour Gas and approx 5000-6000 M3/ day of Sour Condensate to produce Sweet Gas & Value Added Products, viz. – LPG, Naphtha, SKO, ATF, HSD & Propane.

The Plant is of strategic importance to the nation as the 3000 Km HVJ Pipeline emanates from Hazira Plant.

It is the life line to scores of industries ranging from Fertilizer to Power, Petrochemical, CNG, Domestic Supply, Ceramic and others in 6 states of India

Savings:

Year Steam from HRSG waste Heat (MT) Saving in Rs. (Lacs)
2013-14 1052767.16 5661.36
2014-15 1257747.01 6763.66

Turbo Expander:

Year Energy Saving (KWH) Saving in Rs. (Lacs)
2013-14 16409910 311.79
2014-15 11624584 220.87

ONGC Hazira Gas Processing Plant







Contact to:

Oil and Natural Gas Corporation Limited
Hazira Plant,
Surat (Gujarat)

Last edited by Neelurk; April 13th, 2020 at 09:27 AM.
Similar Threads
Thread
BPCL Hazira Surat
ONGC Plant in Gujarat
Ongc hazira ccpp
Oil and Natural Gas Corporation Limited Hazira
ONGC Plans Urea Plant In Tripura
ONGC Hazira Plant
VTU Image Processing Syllabus
ONGC Tripura Urea Plant
ONGC Hazira Exam Results
ONGC Plant Location
ONGC haZira Tender
About ONGC URAN Plant
DTU Image Processing
CISF Unit ONGC Hazira
Wastewater Treatment Plant ONGC



Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 11:20 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8