#1
April 10th, 2017, 02:44 PM
| |||
| |||
Riyadh Metro Railway
Hi I would like to have the information about Riyadh Public Transport Project (RPTP) as well as details of BACS Riyadh Metro Project?
|
#2
April 10th, 2017, 03:58 PM
| |||
| |||
Re: Riyadh Metro Railway
The Riyadh Metro is a fast travel framework serving the city of Riyadh. It comprises of 6 metro lines spreading over an aggregate length of 176 kilometers with 85 stations. The venture cost $22.5 billion to manufacture. It is planned to open in 2019. BACS Riyadh Metro Project The BACS consortium will be in charge of the outline and work of Lines 1 and 2 of the Riyadh metro organize. These two lines will shape some portion of the six-line metro framework that will keep running for an aggregate length of 176 kilometers over the city and incorporates 85 stations. The extent of work on Lines 1 and 2 incorporates definite auxiliary, structural and travel framework outline together with development, testing and authorizing works. Our extension additionally incorporates the obtainment of all items and materials important to bolster extend conveyance. It is completely in charge of the plan and incorporation of the travel frameworks and the common foundation. Working from the Employers Requirements, the BACS consortium will fabricate, outfit, introduce, test and commission all parts identified with both the travel frameworks and the common foundation. Line 1 will extend from north to south through the focal point of Riyadh, along the Olaya-Batha hallway, covering 38 kilometers. The line will incorporate 22 stations and 4 exchange stations where it will associate with other new metro lines. Quite a bit of Line 1 will be underground. Line 2 will run east to west along King Abdullah Road and will be constructed for the most part at level (15km) with some lifted segments. This line will run east to west and will develop more than 25 kilometers with 13 stations and 3 exchange stations. |
|