2023 2024 EduVark > Education Discussion > General Discussion


  #1  
December 13th, 2017, 04:16 PM
Super Moderator
 
Join Date: Mar 2012
AICTE MODROBS Utilization Certificate

Hi I would like to have the information about Modernization and Removal of Obsolescence (MODROBS) as well as the details of the different aspects of MODROBS?

The MODROBS scheme expects to modernize and evacuate out of date quality in the Laboratories/Workshops/Computing offices (Libraries are barred), in order to improve the useful productivity of Technical Institutions for Teaching, Training and testing purposes.

It likewise bolsters new advancements in Class Room and Laboratory/Teaching Technology, improvement of Lab Instructional Material and proper Technology to guarantee that the commonsense work and venture work to be done by understudies is contemporary and suited to the necessities of the Industry.

The gear financed under the plan up to a furthest reaches of Rs 20 lakhs/ - could be in a perfect world utilized for up degree of hardware in existing research centers, improvement of execution parameter particular of existing hardware, fuse of most recent advancement in the field and substitution of old devalued gear by present day gear.

Notwithstanding above significant destinations, the gear introduced through MODROBS can be utilized for aberrant advantage to Faculty/Students through Continuing Education programs, Training programs for nearby industry and consultancy work.

Qualification

(a), (b) and (c) can be included from activity for Academic Networks

(a) AICTE endorsed Technical Institutions/University Departments with no less than 10 years of presence. (b) For self financing/Institutes:

Greatest 3 recommendations for every foundation every year including endorsed before yet not finished would be considered.

(c) For Govt. /Govt. supported Institutes:
Most extreme 10 proposition for each establishment every year including endorsed before yet not finished would be considered.

Term of the Project

(a) Duration of venture will be two years from the date of receipt of assets in the foundation's account.

Limit of Funding

(a) Total financing of Rs.20 Lakh. 8.1.5 Disbursement of the Funds

(a) 100% concede of authorized sum will be discharged to Govt. /Govt. helped Institutes.

(b) To private establishments, gifts will be authorized as 80% of the endorsed sum as progress took after by 20% as repayment on accommodation of the Utilization authentication and other supporting records as determined in wording and states of MODROB.

Processing Methodology:

(a) The proposition should be surveyed by a specialist board constituted as takes after:

(b) Three part master board of trustees not underneath the rank of Associate Professor.

No less than two individuals among the specialists should be from the concerned stream

Modernisation & Removal of Obsolescence Proforma Cum Evaluation Sheet


Last edited by Neelurk; March 31st, 2020 at 09:48 AM.
Similar Threads
Thread
AICTE Modrobs Proposal Sample
All India Council for Technical Education + MODROBS
ICMR Drug Utilization
Get MBA Certificate
AICTE Modrobs Utilization Certificate Format
Aicte (www.aicte.ernet.in)
DRDO Utilization Certificate
KSOU AICTE Approval Certificate
UHD MBA Certificate
AICTE AICTE Approved Colleges
Power Grid Utilization
UGC NET E Certificate
Is there any alternative for the provisional certificate as the company officials asking for Provisional Certificate
Tips to check whether my certificate is AICTE or UGC approved?
PTU B. Tech EE-6th Semester Electric Drives and Utilization Exam paper



Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 04:49 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8