#1
June 15th, 2016, 03:01 PM
| |||
| |||
Cost of Sponge Iron Plant in India
Hi I would like to have the information about the specific requirements for starting a Sponge Iron Plan in India and the investment which was made for the different sponge iron plants which are operational in India?
|
#2
June 15th, 2016, 03:19 PM
| |||
| |||
Re: Cost of Sponge Iron Plant in India
Sponge Iron will be iron metal lessened straightforwardly in strong state utilizing coal gas, natrual gas or coal as reductants and is otherwise called Directly Reduced Iron (DRI). The requirement for improvement and commercialisation of wipe iron assembling process emerged in late 50's when Electric Arc Furnaces (EAFs) occupied with assembling steel began confronting issues of accessibility of scrap of craved quality, the customary wellspring of their iron metallics. Different innovations produced for the assembling of wipe iron might be delegated: A. Gas Based Technologies Fluidised Bed Technologies Innovations utilizing hydrogen as reductant Innovations utilizing carbon monoxide as reductant Innovations utilizing blend of both hydrogen and carbon monoxide as reductant Static bed innovations utilizing blended gas as reductant Moving bed advances utilizing blended gas as reductant The gas based advances were equipped for utilizing either common gas connected with oil or lessening gas got from coal. B. Strong Reducant or Coal Based Technologies Out of the few advances grew just a couple were turned out to be financially fruitful; the plants taking into account the others like Purofer, Armco, Wiberg Sodefors, NSC, Plasma red and Usco were either shut down or disassembled for different reasons. The achievement of a portion of the advances was restricted to a couple plants of little limits as it were. Capital Equipment Required for DR Processes: The basic equipment required for the gas based plants is: Natural gas reformer Reduction reactor/shaft kiln Reducing gas heater CO2 removal unit Reducing and cooling gas compressors Cooling water circuits for equipment and for process gas (viii) Boiler feed water system Inert gas generation system Raw materials and product handling systems Instrumentation and control system The basic capital equipment required for the coal based processes is: Raw materials handling and feeding system Rotary kiln with air injection and coal blowing systems Rotary cooler Product separation and handling System Waste gas cleaning system Briquetting system Electrical system Instrumentation and control system The capital investment made by existing DRI plants is summarised below: Plant Capacity Year of commis- Investment TPA sioning Rs. crores SIIL, Unit 1 30,000 1980 11.8 SIIL, Unit 2 30,000 1985 8.2 OSIL 1,35,000 1984 39.8 IPITATA 90,000 1986 35.0 BSIL 1,50,000 1989 112.0 The present necessity of capital venture for littler size (up to 60,000 TPA) coal based plant receiving indigenous innovation shifts between Rs.6500 to Rs.8000 per ton of yearly introduced limit. In this manner, the capital venture for 30,000 TPA plant taking into account this innovation has been demonstrated to fluctuate between Rs.45 crores to Rs.49 crores. |