#1
April 25th, 2015, 10:23 AM
| |||
| |||
DMRC Line 8
Is Line 8 connecting Janakpuri West to Botanical Garden and Line 6 extension connecting Central Secretariat to Kashmere Gate of Phase-III of the Delhi Metro? Also tell me the stations of the line 8 and the timing and the schedule of the Delhi Metro? Testing started on the initially finished segment of Delhi Metro Line 8 (Magenta Line). Delhi metro organize on June 8, when the primary low-speed trials occurred on a 3.5km area between Kalindi Kunj stop and Okhla Vihar station. Delhi Metro Rail Corporation (DMRC) says the underlying phases of testing are concentrating on gaging and the execution of moving stock subsystems. Throughout the following couple of months the test program will approve the operation of CBTC, prepare braking, cooperation between the trains and the operational control focus, and overhead charge. The 38.2km line takes after the external ring street south of the city from Janakpuri West to Hauz Khas, Kalindj Kunj, and Botanical Garden in Noida. Line 8 will have 25 stations, 15 of them underground, and 19km of the course will be raised or at review with 17.3km in passages. Administrations will be worked by an armada of Hyundai-Rotem driverless trains, three of which have now been conveyed Kalindi Kunj warehouse. CBTC for the venture was given by Nippon Signal, Japan. List of stations on the Magenta Line Janakpuri West – interconnects with Blue Line Janakpuri C-2B Dabri Mor Dashrath Puri Palam Sadar Bazar Indira Gandhi Domestic Airport Indira Gandhi International Airport NH-8 Shankar Vihar Vasant Vihar Munirka R.K Puram IIT Hauz Khas – interconnects with Yellow Line Panchsheel Park Chirag Delhi G.K Enclave Nehru Place Kalkaji – interconnects with Violet Line Mathura Road/NH-2 Okhla Phase 3 Ishwar Nagar Jamia Nagar Okhla Vihar Jasola Vihar Kalindi Kunj Yamuna River Amity NOIDA Botanical Garden Last edited by Neelurk; July 1st, 2020 at 04:27 PM. |
#2
March 9th, 2017, 02:21 PM
| |||
| |||
Re: DMRC Line 8
Hi I would like to have the details about the testing which was started by the Delhi Metro Rail Corporation (DMRC) on the Delhi Metro Line 8 (Magenta Line)?
|