I want to get the details of Koldam Dam Hydropower Project of National Thermal Power Corporation (NTPC) so can you provide me?
|
Similar Threads | ||||
Thread | ||||
What Do You Mean By NTPC | ||||
LDC Job In NTPC | ||||
Md of ntpc | ||||
Ntpc gic | ||||
PPT on NTPC | ||||
Ntpc rsi | ||||
Ntpc nse | ||||
CEO of NTPC | ||||
Csr ntpc ppt | ||||
Ntpc eoi | ||||
PRP in NTPC | ||||
Ntpc ceo | ||||
Ntpc fgd | ||||
Ntpc pdf | ||||
Mp ntpc |
#2
August 30th, 2017, 11:46 AM
| |||
| |||
Re: Koldam NTPC
The Koldam Dam Hydropower Project is an embankment dam on the Satluj River upstream of the Dehar Power House. The dam was constructed by National Thermal Power Corporation (NTPC). The main purpose of the dam is hydroelectric power generation and it will support an 800 MW power station. It is 18 km from Bilaspur off the Chandigarh-Manali Highway (NH-21) near Barmana, Himachal Pradesh. Approved Capacity - 800 MW Installed Capacity - 800 MW Location - Bilaspur, Himachal Pradesh Water Source - Satluj River Beneficiary States- Delhi, Haryana, Punjab, Rajasthan, Uttar Pradesh, Himachal Pradesh, J & K , Chandigarh Approved Investment - Rs. 4527.15 Crore Unit Sizes -4X200 MW Units Commissioned Unit Number Capacity (MW) Date of Commissioning Status 1 200 2015 Mar commissioned. 2 200 2015 April commissioned 3 200 2015 April commissioned 4 200 2015 June commissioned TOTAL 800 Contact- Koldam Dam Hydropower Project P.O. – Barmana, Distirct – Bilaspur, Himachal Pradesh-174013 Telephone (STD Code – 01978) 245061 Fax 245063 |
|