Midc bcc

Hello buddy I require the Check List For Building Completion Certificate of Maharashtra industrial development corporation will you please make available it for me ??

As you require the Check List For Building Completion Certificate of Maharashtra industrial development corporation

Here id given below:

1) Amended plans in metric system if the changes are made during construction epoch (Plans in Six sets)

2) Latest permission to operate from Maharashtra Pollution Control Board for air & water.

3) True copy of approval issued by the Factory Inspector along with the original letter & plan.

The unique letter & plan will be returned after verification.

4) True copy of license of the Architect, along with innovative which will be returned after verification.

5) Certificate of licensed Architect, stating that the work is approved out adequately under his supervision.

6) Certificate from the qualified Structural Engineer, regarding soundness of the structure, quality of materials use of the work stating structure is constructed as per accepted design

7) Get the drainage plans approved, if not done previously through licensed plumber along with “L” section of drainage line with all details.

8) The copy of the licensed of plumber, who has approved out work along with inventive license, which will be returned after verification.

9) Certificate from the licensed plumber stating that the internal, external, drainage works are accepted out as per rules & approved drawings.

10) True copy of approval from Explosive Department if there is any storage of explosion.

11) Temporary structure, if any within plot are is pull downed before approaching Building Compilation Certificate.

12) Compound wall & approach road should be constructed as per approved plans and cross drainage’s work having NP2 class pipe of required sizes, but not less than 1200mm must be provided on the approach road.

13) Certificate of the owner stating that provision for 24hrs storage of water is made.

14) After submission of the revised plans, the approval will be accorded after site verification by the worried representative of M.I.D.C.

15) True copies of approval issued by the Foods & Drugs Department, along with the original letter will be returned after verification.

16) Plantation of Tree least 1.00 No. per 100 m2.

17) If you have changed Architect, then submit previous Architect’s N.O.C.

18) Development charges, inspection charges as per requirement.

19) NOC from CFO MIDC if height exceeds 15.00mt.

20) NOC from Local Authority, MCGM. For property tax.

21) NOC from Civil Aviation Authority for height Clearance.

22) Provide parking least 1 Nos. per 100m2 Built Up Area.

Last edited by Neelurk; June 3rd, 2020 at 11:29 AM.
Similar Threads
Thread
MIDC Job
Iip midc
Midc jt ceo
Ufo midc
Midc sme
MIDC Ltd
Midc dy ceo
Bcc midc
Big MIDC
Ceo midc
Ups midc
Midc il
Cmi midc
Midc swc
MIDC Gov Job



Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 05:20 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8