2023 2024 EduVark > Education Discussion > Career and Jobs > Estimation and Quantity Surveying Anna University


Thread: Estimation and Quantity Surveying Anna University Reply to Thread
Your Username: Click here to log in
Title:
  
Message:
Trackback:
Send Trackbacks to (Separate multiple URLs with spaces) :
Post Icons
You may choose an icon for your message from the following list:
 

Additional Options
Miscellaneous Options

Topic Review (Newest First)
April 23rd, 2015 10:45 AM
Nitin Sharma
Re: Estimation and Quantity Surveying Anna University

You are asking for the Anna University Estimation and Quantity Surveying question paper. here I am uploading a file that contains the Anna University Estimation and Quantity Surveying question paper. You can download this from here. This is as follows:

..What are methods to be adopted for volume calculating?
• From cross-section
• From spot level
• From contours
2.Define analysis of rates.
Determination of rates of works from the qualities and cost of materials and
labours required is termed as analysis of rates
3.Define a tender.
Tender is an offer given in writing to execute specified articles or materials at a
certain rate, within a fixed time, under certain conditions of agreement between the
contractor and the party, which may be a government department or an individual.
4.Define ‘contract’
Contract is merely an agreement being enforceable by law between two persons
or parties.
5.What are the types of culvert?
1. Arch culvert
2. Slab culvert
3. Pipe culvert
4. Box culvert
6.what are the methods of estimate?
1.Detailed estimate
2. Abstract estimate
7. What are the types of estimate?
1 Preliminary Estimate or Rough cost estimate
2. Plinth area estimate
3. Cube Rate Estimate or Cubical Content Estimate
4. Approximate Quantity Method Estimate
5. Detailed Estimate or Item Rate Estimate
6.Revised Estimate
7. Supplementary Estimate And Revised Estimate.
8.Annual Repair or Maintenances Estimate
9. Supplementary Estimate
8. Briefly explain about preliminary Estimate.
The estimate which prepared using any rough method to get the approximate cost
construction anticipated in a project is called an approximate or rough estimate. Since this
estimate is normally prepared in the preliminary estimate.

Anna University Estimation and Quantity Surveying question paper






April 23rd, 2015 09:30 AM
Unregistered
Estimation and Quantity Surveying Anna University

I am searching for the Estimation and Quantity Surveying Anna University question paper? Can you please tell me from where I can download the Anna University Estimation and Quantity Surveying question paper?

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT +5. The time now is 09:58 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8