2023 2024 EduVark > Education Discussion > General Discussion


  #1  
January 17th, 2018, 11:21 AM
Unregistered
Guest User
 
Northern Power Grid Duos Charges

Hii sir, I Wants to get the Information About the Use of System Charging Statement of the Northern Power Grid ?
Similar Threads
Thread
Northern Power Grid Customer Service
TN Power Grid
Power Grid Map CT
Northern Power Grid Vacancies
AP Power Grid Map
Power Grid CSV
Shrouding Northern Power grid
Power Grid RI
Northern Power Grid Pension
Northern Power Grid CEO
NE Power Grid
Up Power Grid
Northern Power Grid New Connections
Power grid map NJ
Northern Power Grid ICP

  #2  
January 17th, 2018, 11:25 AM
Super Moderator
 
Join Date: Mar 2012
Re: Northern Power Grid Duos Charges

As you Asking for the Information About the Use of System Charging Statement of the Northern Power Grid is given below


Purpose of the Charging Statement :


This statement tells you about our charges and the reasons behind them. It has been prepared consistent with Standard Licence Condition 14 of our Electricity Distribution Licence. The main purpose of this statement is to provide our schedule of charges1 for the use of our Distribution System and to provide the schedule of adjustment factors2 that should be applied in Settlement to account for losses from the Distribution System.

Validity

This charging statement is valid for services provided between the effective from date and the effective to date stated on the front of the statement. The statement remains valid between those dates until updated by a revised version


When using this charging statement, care should be taken to ensure that the statement or statements covering the period that is of interest are used.

Charge application and definitions

2.1. The following section details how the charges in this statement are applied and billed to Users of our Distribution System.

We utilise two billing approaches depending on the type of metering data received.
The ‘Supercustomer’ approach is used for Non-Half-Hourly (NHH) metered, NHH
unmetered or aggregated Half-Hourly (HH) metered premises and the ‘Site-specific’
approach is used for HH metered or pseudo HH unmetered premises.

Typically NHH metered are domestic and small businesses, HH metered are larger businesses and unmetered premises are normally streetlights.

Supercustomer charges

2.7. Supercustomer charges include the following components:
• a fixed charge - pence/MPAN/day, there will only be one fixed charge applied to
each MPAN; and
• unit charges - pence/kilowatt-hour (kWh), more than one kWh charge may apply
depending on the type of tariff for which the MPAN is registered.
2.8. Users who wish to supply electricity to a Customer whose metering system is:
• Measurement Class A or B, and settled on Profile Classes (PC) 1 through to 8; or
• Measurement Class F or G;
will be allocated the relevant charge structure set out in Annex 1.

For more information you may Consider the below Attachement that is Free to Download

Information About the Use of System Charging Statement of the Northern Power Grid





Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 10:16 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8