NPCIL Kudankulam

I am Akhil. Will anyone tell me about the NPCIL Kudankulam projects and about the NPCIL Kudankulam milestones?
Similar Threads
Thread
NPCIL Tamilnadu
Npcil faq
NPCIL Hyderabad
Cut off for NPCIL
Recruitment in NPCIL at Kudankulam
NPCIL Gov
NPCIL Paper
Npcil ceo
NPCIL Careers
NPCIL Cut Off Marks
NPCIL Power
How to join NPCIL
Npcil
Npcil md
Npcil mt

  #2  
April 13th, 2015, 11:41 AM
Super Moderator
 
Join Date: Mar 2012
Re: NPCIL Kudankulam

As per your request, I am telling you about the Nuclear Power Corporation of India Limited (NPCIL), Kudankulam project.

Unit Number: 2
Reactor Type: V V E R -1000 (PWR)
Capacity (MWe): 1000
Schedule Date of Commercial Operation: Dec-2008
Expected Date of Commercial Operation: Jun-2015 (First Criticality)
Physical Progress: 97.70 % as on Feb-2015

Milestones:

Start of Commercial Operation
Unit Comprehensive test (Phase-C4 commissioning)
Power startup (Phase C1, C2, C3 commissioning)
Syncronisation of Turbo-Generator
Attainment of First Criticality and Low Power Tests (Phase-B2 commissioning)
Sub-criticality tests (Phase-B1 commissioning)
Fuel loading
Pre-service inspection of NSSS equipment (Phase-A4 commissioning)
Removing of dummy fuel from RPV
Hot run of Nuclear Steam Supply System (NSSS) (Phase A-3 Commissioning)
Individual function test of equipment / systems (phase A-1, commissioning)
Containment pressure boundary test (Phase A-2 Commissioning)
Hydro test & circular flushing of primary circuit
Commissioning of Compressors
Reactor Checkup and Assembly for "Stage Hydraulic Test"
Dummy fuel loading
Spillage to open reactor
Putting Turbine on Barring Gear in TB-1
Pre-stressing of RB Inner Containment (IC) Dome
Commissioning of Trestle Crane
Commissioning of DM Plant
Charging of Reserve Power Supply System (RPSS)
Commissioning of 220 KV GIS System
Erection of Turbine & Generator
Erection of NSSS Equipment & pipelines (MCP)
Construction of Outer Containment (OC) Dome
Construction of RB Inner Containment (IC) Dome
Commissioning of Polar Crane
Construction of Main Control Room and Auxiliary Building (up to 22.8 M)
Construction of Emergency Power Supply and Control Building
Construction of Turbine Building up to 36.5 M Including Crane beam.
Construction of Primary Containment of RB Wall upto 43.9M
Construction of Switchyard Control Building
Construction upto RB + 5.4 Slab
Completion of RB 0.00m Slab
Completion of RB Foundation Slab
First Pour of Concrete
Ground Break

Contact Details:

NPCIL Kudankulam Atomic Power Plant
Kudankulam PO, Radhapuram Taluk, Tirunelveli, Tamil Nadu 627106 ‎
04637 282 201



Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 01:25 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8