#1
April 13th, 2015, 09:45 AM
| |||
| |||
NPCIL Kudankulam
I am Akhil. Will anyone tell me about the NPCIL Kudankulam projects and about the NPCIL Kudankulam milestones?
|
#2
April 13th, 2015, 11:41 AM
| |||
| |||
Re: NPCIL Kudankulam
As per your request, I am telling you about the Nuclear Power Corporation of India Limited (NPCIL), Kudankulam project. Unit Number: 2 Reactor Type: V V E R -1000 (PWR) Capacity (MWe): 1000 Schedule Date of Commercial Operation: Dec-2008 Expected Date of Commercial Operation: Jun-2015 (First Criticality) Physical Progress: 97.70 % as on Feb-2015 Milestones: Start of Commercial Operation Unit Comprehensive test (Phase-C4 commissioning) Power startup (Phase C1, C2, C3 commissioning) Syncronisation of Turbo-Generator Attainment of First Criticality and Low Power Tests (Phase-B2 commissioning) Sub-criticality tests (Phase-B1 commissioning) Fuel loading Pre-service inspection of NSSS equipment (Phase-A4 commissioning) Removing of dummy fuel from RPV Hot run of Nuclear Steam Supply System (NSSS) (Phase A-3 Commissioning) Individual function test of equipment / systems (phase A-1, commissioning) Containment pressure boundary test (Phase A-2 Commissioning) Hydro test & circular flushing of primary circuit Commissioning of Compressors Reactor Checkup and Assembly for "Stage Hydraulic Test" Dummy fuel loading Spillage to open reactor Putting Turbine on Barring Gear in TB-1 Pre-stressing of RB Inner Containment (IC) Dome Commissioning of Trestle Crane Commissioning of DM Plant Charging of Reserve Power Supply System (RPSS) Commissioning of 220 KV GIS System Erection of Turbine & Generator Erection of NSSS Equipment & pipelines (MCP) Construction of Outer Containment (OC) Dome Construction of RB Inner Containment (IC) Dome Commissioning of Polar Crane Construction of Main Control Room and Auxiliary Building (up to 22.8 M) Construction of Emergency Power Supply and Control Building Construction of Turbine Building up to 36.5 M Including Crane beam. Construction of Primary Containment of RB Wall upto 43.9M Construction of Switchyard Control Building Construction upto RB + 5.4 Slab Completion of RB 0.00m Slab Completion of RB Foundation Slab First Pour of Concrete Ground Break Contact Details: NPCIL Kudankulam Atomic Power Plant Kudankulam PO, Radhapuram Taluk, Tirunelveli, Tamil Nadu 627106 04637 282 201 |
|