2023 2024 EduVark > Education Discussion > General Discussion


  #1  
February 9th, 2016, 08:22 AM
Unregistered
Guest User
 
NTPC Assam

Hi I would like to know a few details about the National Thermal Power Corporation plant which was to be set up in Assam State?
Similar Threads
Thread
Assam University Silchar (Assam) Cut Off
Home Assam Board of Secondary Education Assam
LDC Job In NTPC
Assam Higher Secondary TET Exam Date Of Assam TET Exam
Md of ntpc
Ntpc gic
Ntpc mou-15
Nse ntpc
NAV of NTPC
Assam Public Service Commission Assam
Cmd ntpc
Mp ntpc
Ntpc hq
Assam University Silchar Assam
Assam Board Secondary Education Assam

  #2  
February 9th, 2016, 08:23 AM
Super Moderator
 
Join Date: Mar 2012
Re: NTPC Assam

State-run NTPC will be considering selling electricity to Bangladesh from its upcoming 750 MW plant at Kokrajhar in Assam once the neighbouring country finalises strategy to buy power from Palatana project in Tripura.

'Bandh culture' in the state which has hindered the State's interests in various aspects. Assam's aim to turn into self-sufficient in power generation has been affected by the agitations that took place in the state.

The State wants to attain self sufficiency in power production with PSU firm NTPC's ambitious Rs 4,720 crore Bongaigaon Thermal Power Project, but it is getting postponed by two years.

The various tenders issued by NTPC Assam are as follows:

Source of NIT
NIT Number
Document
Sale
Close Date
Contract Classifications
Description
E-Tender
2
Bongaigaon (Assam) 40047850
20/1/2016
Services
Biennial Rate Contract
For Transportation of Materials from All Over India To NTPC BgTPP And Vice Versa

E-Tender
1
Bongaigaon (Assam) 40048509
20/1/2016
Equipment Supply & Erection
PROCUREMENT OF HT CABLE INDOOR TERMINATION KIT AND STRAIGHT THROUGH JOINTING KIT AT NTPC, BONGAIGAON

E-Tender
Bongaigaon (Assam) 40043201
24/12/2015
Equipment Supply & Erection
Procurement of Safety Net and Safety Belt for NTPC BgTPP

E-Tender
Bongaigaon (Assam) 40048321
24/12/2015
Equipment Supply & Erection
SUPPLY, INSTALLATION & COMMISSIONING OF LT SWITCHGEAR 415V, 1600A AT NTPC, BONGAIGAON


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 11:56 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8