NTPC Gidderbaha

Hello sir, from which day NTPC has started Gidderbaha plant? Please provide me basic details of NTPC Gidderbaha plant? How much land acquisition in NTPC Gidderbaha?
Similar Threads
Thread
What Do You Mean By NTPC
Md of ntpc
Ntpc gic
PPT on NTPC
Ntpc rsi
Ntpc nse
State Bank Of India Gidderbaha
CEO of NTPC
Central Bank of India Gidderbaha
Csr ntpc ppt
Ntpc eoi
PRP in NTPC
Ntpc ceo
Ntpc fgd
Mp ntpc

  #2  
February 5th, 2016, 02:11 PM
Super Moderator
 
Join Date: Mar 2012
Re: NTPC Gidderbaha

The Gidderbaha Thermal Plant is a proposed 2,640 megawatt (MW) coal-fired power station in Punjab, India. And this plant is handled by NTPC.

The project is located in Ghagga village near Gidderbaha town in the Muktsar District. The map below shows the location of Ghagga but not the exact location of the project.

With the land acquisition for Punjab’s 2,640 MW Gidderbaha Power Plant underway, the National Thermal Power Corporation (NTPC) has given the timeline of March 2015 for commissioning of first unit (660 MW) of the plant. The state is expected to be entitled to 50 per cent allocation of power from the plant

But The National Thermal Power Corporation was delayed construction for over a year because it has yet to obtain statutory clearances from the power ministry and the pollution control board, and to establish a coal linkage.

Project Details

Sponsor:
Punjab State Electric Board

Location:
Ghagga, Theri and Babania villages near Gidderbaha town,
Muktsar district, Punjab

Status:
Cancelled

Capacity:
2640 MW

Estimated annual CO2:

Source of financing: Power Finance Corporation


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 05:39 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8