#1
March 27th, 2017, 08:14 AM
| |||
| |||
Ntpc ppt
I have to make a PPT Presentation on CERC Discussion Paper on Terms & Conditions of Tariff Applicable of NTPC. So someone is here who will provide sample PPT Presentation on CERC Discussion Paper on Terms & Conditions of Tariff Applicable of NTPC to me as soon as possible?
|
Similar Threads | ||||
Thread | ||||
What Do You Mean By NTPC | ||||
LDC Job In NTPC | ||||
Md of ntpc | ||||
Ntpc gic | ||||
PPT on NTPC | ||||
Ntpc rsi | ||||
CEO of NTPC | ||||
Csr ntpc ppt | ||||
Ntpc eoi | ||||
PRP in NTPC | ||||
Ntpc ceo | ||||
Ntpc fgd | ||||
Ntpc pdf | ||||
Cmd ntpc | ||||
Mp ntpc |
#2
March 27th, 2017, 11:06 AM
| |||
| |||
Re: Ntpc ppt
As you are searching for PPT Presentation on CERC Discussion Paper on Terms & Conditions of Tariff Applicable of NTPC, so here I am providing following sample PPT Presentation: NTPC Sample PPT Presentation on CERC Discussion Paper on Terms & Conditions of Tariff Applicable Capacity Addition & Resources During 2002-03 peak shortages were 12.2% and energy shortages were 8.8%. These shortages are with 57% households yet to be electrified. Rs 9,00,000 crores investment required in generation, transmission, distribution etc. Assuming 30:70 ratio 2,70,000 crores of equity and 6,30,000 crore debt needed in next 8-9 years In the present climate, CPSUs, State Utilities and private sector put together are not in position to make required investments Private Sector – Meager investments after private Power Policy in 1991 and outlook pessimistic Merely 5476 MW* capacity addition by IPPs in VIII and IX Plans Only 2024 MW+ under construction presently During last 2-3 years many IPPs (Hirma, Co-gentrix, Bhadravati, Hinduja, Videocon, Rosa, AES etc) have abandoned the projects Many International players like National Power, Powergen, CL&P, Southern Electric, PESG etc appear to have lost interest in Indian Power sector. Statutory Provisions Reg. Uniform Tariff Norms As per Section 61(a) of the Electricity Act 2003, State Regulatory Commissions while specifying the terms & conditions for determination of tariff, shall be guided by the principles and methodologies specified by the Central Commission for determination of tariff applicable to generating companies and transmission licensees This statutory provision ensures applicability of uniform tariff norms for all utilities in the country such as central power utilities, state power utilities, IPPs, licensees etc. Tariff on Normative Basis Following provisions in the present tariff are on actual basis: Rate of interest on loan Repayment of loans (normative or actual whichever is higher) O&M cost Station operating parameters (for new stations norm or actual whichever is lower) The Hon’ble Commission may specify different factors for tariff determination on normative basis as given below: Return - % ROE Depreciation on normative basis Interest rate linked to PLR Predefined Loan Repayment Period Normative Debt:Equity Ratio Benchmark/Current Capital Cost Working Capital provisions on norms O&M Cost - %age of current capital cost Plant Operating Parameters on norms Here I am attaching that sample PPT File for your reference: |