2023 2024 EduVark > Education Discussion > General Discussion


  #1  
October 7th, 2017, 08:40 AM
Unregistered
Guest User
 
THDC India Ltd Noida

Hi I would like to have brief profile of as well as the contact information about the different units of THDC as well as address of its Corporate Office?
Similar Threads
Thread
Taylor THDC 955
THDC Career
THDC Colony
THDC Kaushambi
THDC India Pvt Ltd
THDC Ltd Mumbai
Vacancy In THDC India Limited
Sewa THDC
About THDC India Limited
THDC India Ltd Recruitment
THDC India Limited Contact
THDC India Ltd Uttarakhand
Thdc India Limited Through Gate
Vacancy in THDC India Limited
Full Form of THDC India Limited

  #2  
October 7th, 2017, 10:02 AM
Super Moderator
 
Join Date: Mar 2012
Re: THDC India Ltd Noida

THDC India Limited is a Joint Venture of Govt. of India and Govt. of Uttar Pradesh. The Equity is partaken in the proportion of 75:25 amongst GoI and GoUP. The Company was consolidated in July' 88 to create, work and keep up the 2400 MW Tehri Hydro Power Complex and other hydro ventures. The Company has an approved offer capital of Rs. 4000 cr. THDCIL is a Mini Ratna Category-I and Schedule "A" CPSE.

The underlying order of THDCIL was to create, work and keep up the 2,400 MW Tehri Hydro Power Complex (including 1000 MW Tehri Dam and HPP, 1000 MW Tehri Pumped Storage Plant and 400 MW Koteshwar HEP) and other Hydro Projects.

Add up to introduced limit of THDCIL directly is 1513 MW. THDCIL has two Hydro producing stations in particular Tehri Stage-I (4X250 MW) and Koteshwar HEP (4X100 MW) and two operational Wind Power Projects in Gujarat, one at Patan (25X2 MW) and another at Devbhoomi Dwarika (30X2.1 MW).

THDCIL directly has an arrangement of 14 ventures totaling to an introduced limit of 5719 MW under different phases of usage/advancement.

The 1,000 MW Tehri Power Station was appointed by THDCIL in 2006-07. The Tehri Project is multipurpose Project giving power toward the Northern Region, Irrigation advantages to Uttar Pradesh, and Drinking Water to NCT of Delhi and U.P. Because of managed discharges from the Tehri stockpiling supply, the current downstream hydro ventures of the State are likewise profiting by method for increase in era at no extra cost to them.

Contact Information:

NCR Office
Unit Head
Sh. U.C. Kannaujia, GM(SP)
0120-2776438
uckannaujia@thdc.co.in
EPABX NO: 0120-2816800-6900

Pipalkoti
Project Head
Sh.U.K. Saxena, GM(Project)
01372-256200
uks_res@yahoo.com
PABX NO: 01376-236391

Lucknow
Dhukwan
Liaison Office
Project Head
Sh. A.K. Porwal, AGM
Sh. J.L. Narang, AGM
0522-2204112
-
atulkporwal@yahoo.co.in
jlnthdc@gmail.com

Tehri
Project Head
Sh. P.P.S Maan, Executive Director(Tehri Complex)
01376-236312
ppsmann@thdc.co.in
EPABX NO: 01376-236391

Contact:


THDC India Ltd.  
Corporate Office
107, Seemant Vihar Society,
Sector 14, Vaishali,
Ghaziabad,
Uttar Pradesh 201010
Phone: 0120 281 6800 ext. 6900


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 08:02 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8