#1
March 23rd, 2017, 05:07 PM
| |||
| |||
Upcoming Offshore Projects ONGC
My sister is making a project based on ONGC. She wants list of Upcoming Offshore Projects of ONGC. So she said me to provide information related to these projects. So will you please tell me from where I can get information about Upcoming Offshore Projects of ONGC? As you want information about Upcoming Offshore Projects of ONGC, so here I am giving following details: ONGC Upcoming Offshore Projects Projects under Tendering Project Details PRP-4 Laying new / replacement of sub-sea pipelines Integrated Development of Daman 7 Well Platforms 1 Riser Platform Pipelines and modification Bassein Development Project BCP A-3 Process Platform BHWell Platform Pipelines C-26 Pipeline Project Laying of Pipelines RUMP-II Tender-I Revamping of platforms RUMP-II Tender-II Revamping of platforms Total Value: USD 1.76 Billion Upcoming Projects Mumbai High South Redevelopment Ph-III 3 Well Platforms, 2 Clamp-On, & Pipelines NQRC Ph-II New LQ for 200 nos. personnel Revamp works at NQ Complex Development of GK- 28/42 Well Platforms Pipelines WIS Reconstruction Project New WIS Platform ONGC Upcoming Offshore Projects Last edited by Neelurk; March 12th, 2020 at 09:35 AM. |
#2
June 27th, 2017, 04:04 PM
| |||
| |||
Re: Upcoming Offshore Projects ONGC
DEAR SIR, WE HAVE DEVELOPED A FAST TRACK CONSTRUCTION TECHNOLOGY WHEREIN WE CAN BUILD YOUR SITE OFFICE, BARRACK, ACCOMMODATION WITH ERRECTION WITHIN A WEEK. AN INDIAN INITIATIVE TECHNOLOGY TO SAVE MOTHER EARTH:- KINDLY FIND BELOW A BRIEF SYSOPSIS. An Indian Innovative technology for overcoming issues faced in the Indian Construction Industry today. Strength of alloy at par with steel Infinite life as alloy is non-corroding Structure as per National Building Code Decrease in quantum and cost of transportation Manually handled, requiring no expensive equipment Lighter mass provides superior resistance to earthquakes INFINIUMTM building is10% of concrete/ 30% of steel Lightweight structural members making handling and erection quicker Erected in all weather conditions - no curing of materials or welding Simple connectivity technology requires limited unskilled labor. INFINIUMTM system consists of a proprietary joinery system • The structure can be erected in difficult terrains through alternate foundation methods • Light building weight allows for construction on building on varied soil conditions • The drywall construction methodology gives the option for relocation of entire building with ‘near –zero’ wastage • INFINIUMTM system has been designed for extreme flexibility of usage • The complete building system can be reused to create a similar/ alternate building as the structure has infinite life ( non-corrodible/ termite proof). • Dismantle the structure, the building is an appreciating asset with the buy back cost of the building exceeding the initial capital cost (based on current trends of aluminum pricing) INFINIUMTM system designed to dismantle rather than demolished saving the environment. The drywall technology used by INFINIUMTM is environmental friendly Does not require water, electricity or heavy machinery like cranes, etc. Does not need sand and aggregates, thus preserving rivers, flood plains, etc. Has lower operational requirements, thus using lesser electricity Can accommodate PV cells, Solar heating systems and enzyme based STP plants Faster construction time, lower transportation costs, negligible skilled labor requirement, no electricity and water demand High Insulation values lead to much lower operational costs. Timely deliveries result in saving cost overruns and reduce interest burden on borrowed monies. Timely delivery leading to efficient operations of Projects New and addition to existing structures Stilted construction in Hilly areas Costal / high salinity areas developments Remote areas with poor road accessibility Areas with high rainfall Revenue generating spaces INFINIUMTM has excellent lifecycle costs savings Advantageous for : CONTACT: PRITINDER SINGH Email: salujaji@gmail.com |
|