Ntpc Jharkhand Power Plant

Can you please provide me the complete detail information about the North Karanpura Thermal Power Plant – Jharkhand? Also tell me the importance of North Karanpura Thermal Power Plant in Jharkhand
Similar Threads
Thread
Wardha Power Plant Akaltara C.G
Power Plant Akaltara Chhattisgarh
Power Plant In Akaltara
KSK Power Plant Akaltara Chhattisgarh
Dhuvaran NTPC Power Plant
BARH NTPC Thermal Power Plant
NTPC Meja power plant address
GAIL Power Plant
IFFCO Power Plant
Power Plant Career Opportunities
BARC Power Plant
Vindhyachal Power Plant NTPC
Simhadri Power Plant NTPC
Mettur Thermal Power Plant
Post Graduate Diploma course in Thermal Power Plant Engineering in National Power Tra

  #2  
February 11th, 2017, 03:20 PM
Unregistered
Guest User
 
Re: Ntpc Jharkhand Power Plant

Hi I would like to have the information about the North Karanpura Super Thermal Power Station which is being build by NTPC?
  #3  
February 11th, 2017, 03:20 PM
Super Moderator
 
Join Date: Mar 2012
Re: Ntpc Jharkhand Power Plant

The initial 660MW unit of NTPC's Rs 14,300 crore North Karanpura Super Thermal Power Station, now under development, at Tandwa in Chatra locale will be authorized in February 2018 according to plan, the organization said

Tending to a question and answer session here on Monday, NTPC general chief Raghavendra Kumar Singh said hence the two 660MW units of the organization will be appointed in August 2018 and February 2019, individually.

He said the North Karanpura warm venture is the main power station in the nation almost a coal mine with surroundings well disposed super basic innovation.

The most huge component of the plant that the venture is outfitted with Ari Cooled Condenser (ACC) to lessen the water prerequisite by 80% contrasted with the customary strategy to secure the environnment by slightest utilization of land and water without precedent for India.

"Need territories like site leveling, and Grading and Drains works have been given over to offices," Singh said.

Development of the 117-km Hazaribag-Barkagaon-Tandwa-Bijupara expressway which will be four. path street extend has been granted to the State Highway Authority of Jharkhand(SHAJ).

NTPC has effectively given over Rs 250 Crore to the SHAJ out of aggregate cost of Rs 441 crore. Streets and the scaffolds will be finished inside in twelve months, Singh said.


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 01:29 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8