#1
January 14th, 2016, 04:26 PM
| |||
| |||
Cc 34 DMRC
Sir I want to know about the Cc 34 contarat of the Delhi Metro Rail Corporation Limited DMRC so can you givew me the4 details Cc 34 was a contract of the Delhi Metro Rail Corporation Limited DMRC for the Design and Construction of Tunnels from Ch. Janakpuri West underground station to Palam Underground Metro station (excluding) (Ch. (+)4591.630) by Shield TBM; Janakpuri West, Dabri Mor and Dashrath Puri underground metro Stations by Cut & Cover Method. It worked in connection with interchange facilities between existing elevated Metro station and proposed underground metro station at Janakpuri West on Janakpuri West–Kalindi Kunj Corridor under Delhi MRTS Project of Phase-III The Approximate cost of work was INR 1031.00 Crores , for the tender Security the amount of INR 10.31 Crores has to be paid The Completion period of the Work was the 39 months The tenderers would be qualified only if they had completed work(s) during last Seven years BID system The bid system was done by using the simple criteria Bid Capacity Criteria : The tenderers will be qualified only if their available bid capacity is more than the approximate cost of work as per NIT. Available Bid Capacity = 2*A*N –B A= Maximum of the value of construction works executed in any one year N = No.of years prescribed for completion of the work B = Value of existing commitments If you want more details you can download the below file Cc 34 dmrc Last edited by Neelurk; May 16th, 2020 at 03:43 PM. |
|