2023 2024 EduVark > Education Discussion > General Discussion


  #1  
October 9th, 2017, 04:08 PM
Unregistered
Guest User
 
DRDO Rustom UCAV

Hi I would like to have the information about DRDO's UAV Rustom-2 as well as the features and also the specifications?
Similar Threads
Thread
DRDO Recruitment Www.Drdo.Gov.In
CTC in DRDO
Drdo rti
Leh drdo
Drdo abm
Drdo srd
JRF in DRDO
Drdo hal
Iit drdo
Drdo rac
Sag drdo
Drdo mba
Rac Drdo 117
Ssc drdo
Drdo ssc

  #2  
October 10th, 2017, 08:46 AM
Super Moderator
 
Join Date: Mar 2012
Re: DRDO Rustom UCAV

Researchers at the Defence Research and Development Organization (DRDO) gaze at a long retribution before they can thump on the entryways of any of the outfitted administrations to offer unmanned air vehicle Rustom-2, which has been re-branded as Tapas.

The Tactical Air-Borne Platform for Surveillance-Beyond Horizon 201 (Tapas-BH 201) as Rustom-2 is called has quite recently figured out how to finish the lady flight, which will be trailed by improvements of nine more models for testing after which the affirmation procedure will begin.

"DRDO needs to make 10 flying machine for test-flying before going into accreditation. It will require a one year of persistent exertion before we can go thumping on the entryways of the clients (military)," DRDO DG S Christopher told.

DRDO likewise illuminated that dissimilar to all the past marking, Rustom-2 won't have be a battle UAV and that is just being produced for observation. The Rs 1,500 crore venture is being tried at once the military intend to build their UAV/ramble stages, incorporating those with battle capacities.

As India keeps on purchasing rambles from abroad, a few specialists trust that Rustom-2 may end up noticeably excess.

The office likewise gave refreshes on the Light Combat Aircraft (LCA) Tejas program in the scenery of the Center clearing decks for situation of an extra 83 airplane for the Indian Air Force (IAF), taking the aggregate requests of LCA to 123.

While the initial 20 LCAs for IAF will go according to the underlying operational setup (IOC), all endeavors are being rolled out to consolidate different improvements ordered for the last operational freedom (FOC) for the second 20 airplane. The rest of the 83 will see a blend of LCA MK1 and LCA Mk2, chip away at which is continuous. Tejas is probably going to miss another due date March 2017-set for the FOC.


Quick Reply
Your Username: Click here to log in

Message:
Options



All times are GMT +5. The time now is 05:25 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Content Relevant URLs by vBSEO 3.6.0

1 2 3 4 5 6 7 8